Showing posts with label backout P4 changelist rervert. Show all posts
Showing posts with label backout P4 changelist rervert. Show all posts

Monday, January 17, 2011

How to backout a P4 changelist

If a check-in of changelist , had edited a.c, b.h,

1. p4 sync @
2. p4 edit //depot/a.c //depot/b.h
3. p4 sync
4. p4 resolve -ay
5. p4 submit

Of course, there can be mix and match. I CL# contained a.c, b.h, c.txt, d.macro,
the above set of operations will maintain the changes for c.txt and d.macro, which may be intended.

For more on the same topic refer to
http://kb.perforce.com/?article=014